Have you ever looked at someone’s layout and wondered how they did all the rock castings? There are basically two methods, dry and wet. The dry method allows the modeler to mix large batches of plaster at a time. Have several molds ready and pour the plaster into molds until your supp...
When we operate a model railroad, we try to simulate the operations of the prototype as much as possible. The “as much as possible” is dependent upon the tastes of the individual operators who gather to run a railroad. This will impact on the amount of paperwork and other ...